
Dear TrailMark Residents,
The TrailMark HOA and the TrailMark Metro District (TMMD) wanted to let you all know that the annual split rail fence painting and maintenance will be underway in Filing 3 very soon.
For those of you who don’t know, Filing 3 is in the very southwest corner of TrailMark and includes the Star Canyon Patio Homes and Condos.
This Thursday, March 27th, members of the HOA and TMMD will be marking broken posts and rails with white X’s. The marked posts and rails will be replaced prior to painting.
As a friendly reminder to those of you who have chicken wire installed to keep your pets inside of your yard, the chicken wire should be installed on the inside of the split rail fence in your own yard and not on the outside of the split rail fence. Now is a good time to relocate your chicken wire if it’s on the outside.
This is a huge filing and it will take several weeks to fix the posts and rails, as well as paint the split rail fence. Again, we wanted to alert all of you in Filing 3 that if you see crews working on the split rail fence, they’ve been hired to do so.
Last year many of you were kind and gave drinks and snacks to the contractors. This is definitely not necessary, but very much appreciated! It just shows how great our neighborhood is.
Thank you,
Ken Colaizzi, President
TrailMark HOA
Littleton, CO 80127
president@trailmark.org
https://www.trailmark.org

